AI Agent Building 101

Demo #2: Meeting Intelligence Agent.

Turn three realistic Microsoft Teams transcripts into one reliable delivery brief: requirements, decisions, risks, stakeholder needs, and clearly owned next steps.

Live demo · transcript analysis

Convert conversation into project clarity.

Participants can open the exact source folder, build the same agent, and compare its conclusions with evidence from the three supplied transcripts.

01 · Scenario

Business problem

Important decisions are trapped in meetingsProject teams leave kickoff and discovery sessions with scattered notes, incomplete requirements, and action items that are easy to lose. This demo creates an agent that consolidates meeting evidence into a review-ready project brief without inventing missing details.
02 · Source folder

Open the demo contents

Demo #2 — 3 Microsoft Teams transcript PDFsThe shared folder contains the Project Kickoff, Requirements Gathering, and Discovery Session transcripts used throughout this exercise.
Open the Demo #2 folder ↗
03 · Starting prompt

Paste this to build the agent

Upload all three PDFs, then use this prompt. The agent is explicitly required to separate confirmed facts from assumptions and attach transcript-and-timestamp evidence.

ROLEYou are a senior Project Manager and Business Analyst specializing in meeting intelligence.
TASKReview all three Microsoft Teams transcript PDFs as one project record. Consolidate the conversations into an evidence-based delivery brief. Create the Claude.MD for all the instructions based on information below. Create a SKILL.MD for the skills below that will have tools to review.
EXTRACTBusiness problem, current-state workflow, users and stakeholders, confirmed requirements, constraints, decisions, risks, open questions, dependencies, and action items with owners.
EVIDENCE RULEFor every material finding, cite the transcript name and timestamp. Never invent a requirement, owner, due date, approval threshold, or technical decision. Mark anything unsupported as “Not confirmed.”
OUTPUTProduce an executive summary, findings table, action register, requirements backlog, and a short list of the highest-value follow-up questions for the next workshop.
QUALITY CHECKIdentify duplicated or conflicting information across transcripts. Separate facts, reasonable inferences, and unresolved questions before presenting recommendations.
04 · Live build

Presentation sequence

  1. Open the shared folder and upload all three transcript PDFs.
  2. Paste the starting prompt and let the agent create its consolidated brief.
  3. Inspect two citations against their transcript timestamps.
  4. Ask it to separate confirmed requirements from open questions.
  5. Generate the action register and next-workshop agenda.
05 · Final output

Final file contents

The actual CLAUDE.md and SKILL.md generated for this demo's fictional Internal Request/Approval Process Replacement project, plus the delivery brief they produced from the three transcripts — shown exactly as built, so the room can see the real result, not a mockup.

Download the complete agent .zip · CLAUDE.md + SKILL.md + assets/ (3 transcripts) + deliverables/
CLAUDE.md
# Project: Meeting Intelligence — Internal Request/Approval Process Replacement

## What this project is

A project record built from Microsoft Teams meeting transcripts (`assets/*.pdf`) covering the
discovery/requirements phase of replacing a manual internal request-and-approval process with a
simple internal application. The consolidated analysis lives in `deliverables/Project_Delivery_Brief.md`.

## Role

When working in this project, act as a senior Project Manager and Business Analyst specializing in
meeting intelligence: turn raw transcripts into a rigorous, evidence-based delivery brief — not a
paraphrase, and not a best-guess fill-in.

## Source material

- `assets/Realistic_Teams_Transcript_1.pdf` — "Project Kickoff"
- `assets/Realistic_Teams_Transcript_2.pdf` — "Requirements Gathering"
- `assets/Realistic_Teams_Transcript_3.pdf` — "Discovery Session"

**Known data-quality issue:** all three transcripts contain identical dialogue, timestamps, and
action items — they differ only in title and one-line project-context description. Treat this as
one evidentiary source filed three times, not three independent meetings. Do not let this
duplication be cited as if it were corroboration across separate conversations. Flag it to the
user/stakeholder rather than silently normalizing it. If new, genuinely distinct transcripts are
added later, re-check for this pattern before treating them as incremental progress.

## Working rules (non-negotiable)

1. **Cite every material finding** to `(<transcript filename> [<timestamp>])`. No citation, no claim.
2. **Never invent** a requirement, owner, due date, approval threshold, or technical decision. If
   the transcripts don't state it, label it **"Not confirmed"** — do not infer a plausible-sounding
   value to fill a gap.
3. **Separate three tiers explicitly** wherever findings are presented: Confirmed (explicit +
   cited) / Reasonable inference (explicit basis, marked as inference) / Not confirmed (a gap, not
   a fact).
4. **Surface duplication and conflicts** across transcripts rather than silently reconciling them —
   if two sources disagree, present both and say so.
5. Action items must always carry Owner, Timing, and Status columns — use "Not confirmed" rather
   than blank or guessed values when the transcript doesn't state them.

## Standard deliverable structure

Any consolidated brief produced from these (or future) transcripts should contain, in order:
1. Executive summary
2. Findings table(s) with a source-evidence column
3. Action register (Owner / Timing / Status / Source)
4. Prioritized requirements backlog with acceptance questions for the next workshop
5. Highest-value follow-up questions for the next workshop

## Tooling

Use the `meeting-intelligence-review` skill (`.claude/skills/meeting-intelligence-review/SKILL.md`)
for the extraction method and citation discipline. Its bundled script
`scripts/extract_transcripts.py` pulls raw text (with timestamps) out of transcript PDFs via
`pypdf` — run it before drawing any conclusion so the full transcript is in view, not a partial read.

## Known open gaps (do not resolve without new source evidence)

- Exact finance-approval dollar threshold
- Specific legacy systems/spreadsheets in scope
- Confirmed delivery date (only "before next quarter" is stated, no year/quarter given)
- Full list of permission levels beyond "manager" vs. "regular employee"
- Named departments/contacts for the planned follow-up interviews

These should stay "Not confirmed" until a future transcript or document explicitly states them.
SKILL.md
---
name: meeting-intelligence-review
description: Consolidate Microsoft Teams (or similar) meeting transcript PDFs into an evidence-based project delivery brief. Use when the user provides multiple meeting transcripts (kickoff, requirements gathering, discovery, workshops) and wants a PM/BA-style consolidated analysis — business problem, stakeholders, requirements, decisions, risks, open questions, and an action register — with every claim traceable to a source transcript and timestamp.
---

# Meeting Intelligence Review

Turn a set of meeting transcripts into a single, evidence-based delivery brief for a project
record. Acts as a senior Project Manager / Business Analyst: extracts facts, never invents them,
and cites every material finding back to its source.

## When to use this skill

- The user supplies two or more meeting transcripts (PDF, DOCX, or plain text) covering the same
  project or initiative and asks for a consolidated summary, requirements extraction, or delivery
  brief.
- The user asks to identify decisions, action items, risks, or open questions "across" multiple
  meetings.
- The user asks you to spot duplicate or conflicting statements between meetings.

Do not use this skill for a single ad-hoc meeting note with no cross-referencing need — a plain
summary is enough there.

## Tools

`scripts/extract_transcripts.py` — extracts raw text from one or more transcript PDFs using
`pypdf`, printing each under a `===== <filename> =====` header so timestamps and speaker lines can
be read and cited directly from the output.

```bash
python3 scripts/extract_transcripts.py assets/*.pdf
```

If the source files are DOCX or TXT instead of PDF, read them directly with the Read tool — this
script is PDF-specific. If a PDF returns no text (scanned/image-based), fall back to OCR (see the
`pdf` skill's OCR section) before proceeding; do not analyze a transcript you can't actually read.

## Method

1. **Extract every transcript first, in full**, before drawing any conclusion. Never summarize
   from a partial read.
2. **Diff the transcripts against each other.** Meeting-to-meeting, look for:
   - Verbatim or near-verbatim duplicated passages (flag this — it changes how much independent
     corroboration the evidence actually provides; do not let duplicated text be double- or
     triple-counted as agreement across meetings).
   - Direct contradictions (e.g., two stated deadlines, two different owners for the same action
     item).
   Surface both explicitly in the brief; don't silently resolve a conflict by picking one side.
3. **Extract into these categories**, each traceable to source:
   - Business problem and current-state workflow
   - Users and stakeholders (name, role, what they said/decided)
   - Confirmed requirements and constraints
   - Decisions and the rationale given for each
   - Risks, assumptions, issues, dependencies
   - Open questions / information gaps
   - Action items with owner and any stated timing
4. **Citation rule:** every material finding gets `(<transcript filename> [<timestamp>])`. A
   finding with no timestamp/transcript backing it does not go in the "Confirmed" sections.
5. **Never invent.** Do not fill in a requirement, owner, due date, approval threshold, budget
   figure, or technical decision that was not explicitly stated. If it's implied but not stated,
   label it "Reasonable inference" and say what it's inferred from. If it's simply missing, label
   it "**Not confirmed**".
6. **Classify every claim** into exactly one of: Confirmed (explicit + cited), Reasonable inference
   (explicit basis + noted as inference), Not confirmed (gap — do not treat as fact downstream).

## Output structure

Produce, in this order:

1. **Executive summary** — 2–3 paragraphs, cites key facts inline.
2. **Findings table(s)** with a source-evidence column for every row.
3. **Action register** — columns: Action, Owner, Timing, Status, Source. Use "Not confirmed" for
   owner/timing when the transcript doesn't state them — never leave blank or guess.
4. **Prioritized requirements backlog** — each item paired with an acceptance question to ask at
   the next workshop (what would need to be confirmed to build this).
5. **Highest-value follow-up questions** for the next workshop — prioritize questions that unblock
   the most backlog items or resolve the biggest confirmed gaps/conflicts.

Save the brief as a Markdown file (e.g., `deliverables/Project_Delivery_Brief.md`) so it's diffable
and versionable. Offer to render it as an Artifact when the user wants a shareable, readable view —
do not publish it automatically if it references people by name in a way the user hasn't indicated
is shareable.

And this is the actual delivery brief the agent produced from the three transcripts — the "what good looks like" reference for the room.

deliverables/Project_Delivery_Brief.md
# Project Delivery Brief — Internal Request/Approval Process Replacement

**Prepared by:** Meeting Intelligence Review (PM/BA)
**Sources reviewed:**
- `Realistic_Teams_Transcript_1.pdf` — "Project Kickoff"
- `Realistic_Teams_Transcript_2.pdf` — "Requirements Gathering"
- `Realistic_Teams_Transcript_3.pdf` — "Discovery Session"

**Attendees (all three sessions):** Sarah (Project Manager), Mike (Business Analyst), Emily (Stakeholder), David (Developer), Lisa (Product Owner)

---

## ⚠ Data-Quality Flag — Read First

The dialogue, timestamps, and action items in **Transcript 1, Transcript 2, and Transcript 3 are
word-for-word identical**. The only differences across the three files are the cover title
("Project Kickoff" / "Requirements Gathering" / "Discovery Session") and a single one-line "Project
Context" description. No new statements, decisions, or attendees appear in the second or third
transcript that were not already in the first.

**Implication:** This brief treats the content as **one evidentiary source that happens to be filed
three times**, not as three independent meetings that built on each other. Every finding below is
cited to all three transcripts where it appears, but reviewers should not read this as
corroboration by three separate conversations — it is the same conversation. This should be raised
with the meeting owner before the next workshop.

---

## 1. Executive Summary

The business wants to replace a manual, spreadsheet-driven internal request process with a simple
internal application. Under the current process, a request is submitted, a manager reviews it, and
finance approves it if it exceeds an unspecified dollar threshold (Transcripts 1–3, [06:00]). The
stakeholder (Emily) reports that the process "works" but is slow because staff re-enter the same
information in multiple systems, and most systems are not integrated (Transcripts 1–3, [02:00],
[14:00]). The largest time losses are approval waiting time and manual spreadsheet updates
(Transcripts 1–3, [10:00]).

The team agreed to a minimum-viable first release that targets the biggest pain points rather than
full scope, with room to add features later (Transcripts 1–3, [16:00]–[18:00]). Daily users will
span Operations, Managers, and Finance, and the system will require role-based permissions since
managers need visibility into different information than regular employees (Transcripts 1–3,
[22:00], [26:00]). Monthly summary reporting was named the top-priority report (Transcripts 1–3,
[36:00]). The only timing signal captured is a target of "before next quarter" (Transcripts 1–3,
[32:00]) — no specific date, quarter, or year was confirmed.

The meeting closed with four action items (document requirements, send sample reports, review
existing systems, schedule the next workshop) but **no owner assigned a due date for any of them**
except the next workshop, which was informally set for "next week" (Transcripts 1–3, [46:00]).
Significant information gaps remain, most notably the exact approval dollar threshold, the specific
systems currently in use, and a confirmed delivery date — all labeled **Not confirmed** below.

---

## 2. Business Problem & Current-State Workflow

| Element | Finding | Source |
|---|---|---|
| Problem statement | Current process "works, but it takes too long because people enter the same information in multiple places" | T1/T2/T3 [02:00] |
| Workflow steps | (1) Request submitted → (2) Manager reviews → (3) Finance approves **if over a certain amount** | T1/T2/T3 [06:00] |
| Approval threshold amount | **Not confirmed** — referred to only as "a certain amount," no figure given | T1/T2/T3 [06:00] |
| Biggest time loss | Waiting for approvals; manually updating spreadsheets | T1/T2/T3 [10:00] |
| System integration state | "Most of it is manual today" — systems are largely not connected | T1/T2/T3 [12:00]–[14:00] |
| Specific current systems in use | **Not confirmed** — named systems not stated | — |

## 3. Confirmed Requirements & Constraints (selected)

| # | Requirement/Constraint | Status | Source |
|---|---|---|---|
| R1 | First release ("v1") should target the biggest pain points, not full scope | Confirmed (decision) | T1/T2/T3 [16:00]–[18:00] |
| R2 | Role-based permissions required; managers must see different information than regular employees | Confirmed | T1/T2/T3 [24:00]–[26:00] |
| R4 | Monthly summary reports are the top reporting priority | Confirmed | T1/T2/T3 [34:00]–[36:00] |
| R6 | Target timing: "before the next quarter" | Confirmed as stated, but no date/quarter/year specified | T1/T2/T3 [32:00] |
| R7 | Exact approval dollar threshold | **Not confirmed** | — |

## 4. Action Register

| # | Action | Owner | Timing | Status | Source |
|---|---|---|---|---|---|
| A1 | Document requirements | Mike (Business Analyst) | Not confirmed (no date given) | Open | T1/T2/T3 [28:00] |
| A2 | Send sample spreadsheets/reports used today | Emily (Stakeholder) | Not confirmed (no date given) | Open | T1/T2/T3 [44:00] |
| A3 | Review existing systems/data before deciding technical approach | David (Developer) | Not confirmed (no date given) | Open | T1/T2/T3 [38:00] |
| A4 | Schedule the next workshop | Sarah (Project Manager) | "Next week" (relative, no calendar date confirmed) | Open | T1/T2/T3 [46:00] |
| A5 | Schedule follow-up interviews with other departments | Mike (Business Analyst) | Not confirmed | Open | T1/T2/T3 [40:00] |

## 5. Highest-Value Follow-Up Questions for the Next Workshop

1. **Data integrity:** Transcripts 1, 2, and 3 contain identical dialogue and action items. Were
   these genuinely three separate sessions, or is this a single transcript filed under three
   titles? If separate, what changed between them?
2. What is the specific dollar/amount threshold that triggers finance approval today?
3. What is the confirmed target delivery date (exact quarter and year), and is it firm or
   aspirational?
4. What specific legacy systems/spreadsheets are in scope for replacement or integration?
5. Beyond "manager" and "regular employee," what is the complete list of roles and their permitted
   actions/visibility?

*(Full brief — all 10 sections, every table, and the complete evidence trail — is in the downloadable .zip above.)*

### Evidence Classification Key
- **Confirmed** — directly and explicitly stated in a transcript, cited with timestamp.
- **Reasonable inference** — a logical implication drawn from confirmed statements, explicitly marked as such.
- **Not confirmed** — no transcript statement establishes this; must not be treated as fact or used as a basis for a downstream decision until validated with the stakeholder.
06 · Debrief

Challenge the agent

Ask the roomDid the agent distinguish a stated requirement from an inference? Could every important claim be traced to a source timestamp? Which follow-up question would reduce the most project risk? What human review is required before these outputs enter the backlog or project plan?

Verify, then trust

Open two cited timestamps live so participants see how traceability changes the quality of an AI-generated brief.

Expose uncertainty

Highlight the missing approval threshold and deadline details as examples of what the agent must not invent.

Move work forward

Finish with an owned action register and focused agenda for the next stakeholder workshop.